LCVision - Meeting with C3/CLIC expert teams

Europe/Zurich
Description

Roman Poeschl is inviting you to a scheduled Zoom meeting.

Topic: LCVision - Physics Part
Time: This is a recurring meeting Meet anytime
Join Zoom Meeting
https://cern.zoom.us/j/68165740245?pwd=YFABLZqMU5eaQa4c7PvdNH8PoIBria.1

Meeting ID: 681 6574 0245
Passcode: 283565

---

One tap mobile
+33170372246,,68165740245# France
+33170379729,,68165740245# France

---

Dial by your location
• +33 1 7037 2246 France
• +33 1 7037 9729 France
• +33 1 8699 5831 France
• +41 31 528 09 88 Switzerland
• +41 43 210 70 42 Switzerland
• +41 43 210 71 08 Switzerland

Meeting ID: 681 6574 0245

Find your local number: https://cern.zoom.us/u/ccSJqhphgN

---

Join by SIP
68165740245@188.185.46.179
• 68165740245@188.185.47.129

---

Join by H.323
• 188.185.46.179
• 188.185.47.129

Meeting ID: 681 6574 0245
Passcode: 283565

 

Participants: Angeles Faus-Golfe, Emilio Nanni, Roman Poeschl, Jenny List

  • C3:
    • Emilio started to write, will copy into overleaf by the end of the week
    • Conclusion on CFS compatibility: ILC-type damping rings usable for C3, no further excavations needed. A bit larger tunnel diameter could be more comfortable, but should fit.
    • prepare tunnel cross-section drawing, make modulators fit below beamline
    • cryostat ready at Chinese production company :)
    • liquid nitrogen and safety regulations? Not clear what the actual issue is, Angeles will contact CERN safety experts
  • CLIC:
    • driven-beam machine will not make sense in existing tunnel
    • will look into klystron-driven version
    • like Emilio did for C3, check which subsystems can be re-used
  • general:
    • what should be considered as upper limit on AC power consumption?
    • ILC limit 300 MW (reached for 1 TeV machine), FCCee@365GeV 350 MW => stay with 300MW, point out where / when this becomes a limiting factor 