3.9GHz Engineering meeting

US/Central
The Hermitage

The Hermitage

Slides
    • 1.3 GHz
      • 1
        RRR specification -- AES problems with ISO auditor
        Speaker: Champion, Foley
      • 2
        Proposed review procedure for cavity orders
        Speaker: Foley
      • 3
        IB4 material inventory control
        Speaker: Foley
      • 4
        Nb55Ti for AES single-cell order
        Speaker: Foley
      • 5
        Single-cell cavities to be fabricated at FNAL -- status of blanks from DESY and HC Stark
        Speaker: Cooley
    • 3.9 GHz
      • 6
        Status of Helium vessels
        Speaker: Mitchell, Foley
      • 7
        Schedule for vertical test of cavity 6
        Speaker: Rowe
      • 8
        Options for fabricating cavities 7 & 8
        Speaker: Foley
      • 9
        Other business