3.9GHz Engineering meeting

US/Central
The Hermitage

The Hermitage

Minutes
    • 1.3 GHz
      • 1
        RRR test results for "drop offs" from cells 3, 5 and 7 of AES cavity AES-001
        Speaker: Cooley, Genfa, Hairong
    • 3.9 GHz
      • 2
        Plasma processing plan for 3.9 GHz
        Speaker: Genfa
      • 3
        Helium vessel titanium weld test results
        Speaker: Hairong
      • 4
        Status of cavities 7 and 8
        Speaker: Foley
      • 5
        Cavity 3 helium vessel status
        Speaker: Mitchell, Foley
      • 6
        Single-cell cavity needs and plans
        Speaker: Foley, Cooley, Genfa, Cooper
      • 7
        Cavity 6 test results and schedule
        Speaker: Timer, Elvin, Allan
    • OTHER BUSINESS
      • 8
        1.5 GHz single-cell cavity from "bad" material
        Speaker: Genfa