3.9GHz Engineering meeting
→
US/Central
The Hermitage
The Hermitage
-
-
09:00
→
09:40
1.3 GHz
-
09:00
RRR test results on "drop offs" from cells 3, 5 and 7 of AES-001 15mSpeaker: Cooley
-
09:15
Plans to have JLab X-ray NbTi used on AES cavity flanges 15mSpeaker: Foley
-
09:30
Requirement for inclusion of attachment rings on single-cell cavities -- Americanization of DESY drawings 10m
-
09:00
-
09:40
→
10:35
3.9 GHz
-
09:40
Status of cavities 7 and 8 10mSpeaker: Foley
-
09:50
Single-cell cavity fabrication status and plans 10mSpeaker: Foley
-
10:00
Helium vessel issues -- material and welder certification -- procedure -- testing, etc. 15mSpeaker: Helen, Mitchell, Champion, etc
-
10:15
Single-cell cavity test results 10mSpeaker: Genfa
-
10:25
Plasma processing plan for 3.9 GHz 10mSpeaker: Genfa
-
09:40
-
10:35
→
10:45
OTHER BUSINESS
-
10:35
1.5 GHz single-cell cavity from "bad" material 10mSpeaker: Genfa
-
10:35
-
09:00
→