3.9GHz Engineering meeting
Monday 6 Aug 2007, 09:00
→
11:05
US/Central
The Hermitage
The Hermitage
Minutes
1.3 GHz
1
RRR test results on "drop offs" from cells 3, 5 and 7 of AES-001
Speaker
:
Cooley
2
Plans to have JLab X-ray NbTi used on AES cavity flanges
Speaker
:
Foley
3
Requirement for inclusion of attachment rings on single-cell cavities -- Americanization of DESY drawings
3.9 GHz
4
Status of cavities 7 and 8
Speaker
:
Foley
5
Single-cell cavity fabrication status and plans
Speaker
:
Foley
6
Helium vessel issues -- material and welder certification -- procedure -- testing, etc.
Speaker
:
Helen, Mitchell, Champion, etc
7
Single-cell cavity test results
Speaker
:
Genfa
8
Plasma processing plan for 3.9 GHz
Speaker
:
Genfa
OTHER BUSINESS
9
1.5 GHz single-cell cavity from "bad" material
Speaker
:
Genfa