3.9GHz Engineering meeting
→
US/Central
The Hermitage
The Hermitage
-
-
1.3 GHz
-
1
RRR test results on "drop offs" from cells 3, 5 and 7 of AES-001Speaker: Cooley
-
2
Plans to have JLab X-ray NbTi used on AES cavity flangesSpeaker: Foley
-
3
Requirement for inclusion of attachment rings on single-cell cavities -- Americanization of DESY drawings
-
1
-
3.9 GHz
-
4
Status of cavities 7 and 8Speaker: Foley
-
5
Single-cell cavity fabrication status and plansSpeaker: Foley
-
6
Helium vessel issues -- material and welder certification -- procedure -- testing, etc.Speaker: Helen, Mitchell, Champion, etc
-
7
Single-cell cavity test resultsSpeaker: Genfa
-
8
Plasma processing plan for 3.9 GHzSpeaker: Genfa
-
4
-
OTHER BUSINESS
-
9
1.5 GHz single-cell cavity from "bad" materialSpeaker: Genfa
-
9
-