    • 1.3 GHz
      • 1
        Report on trip to observe AES equator welds
        Speaker: Foley
      • 2
        Comments on schedule/results for measurements and/or tests
        Comments on schedule/results for the following measurements and/or tests: (a) RRR measurements of weld samples from AES (Cooley) (b) RRR measurements of weld samples from ACCEL (Cooley) (c) SEM analysis of iris cut-outs from AES cavities (Cooley)
        Speaker: Cooley
      • 3
        Discussion: do we place order with AES for more one-cell cavities or order more material?
    • 3.9 GHz
      • 4
        Report on test results of 3.9 GHz Helium vessel weldment from Ameriflex
        Speaker: Cooley, Hairong
      • 5
        Helium vessel status -- welder certification
        Speaker: Foley
      • 6
        Helium vessel welding issues -- welder certification -- procedure
        Speaker: Mitchell, Foley
      • 7
        Status of cavity No. 7 and Cavity No. 8
        Speaker: Foley
      • 8
        Schedule for scanning 3.9 GHz blanks for single-cell cavities
        Speaker: Cooley