SLAC ILC Beam Delivery and Interaction Region:ATF2 mtg, NLC Beam Dump, IR Rad. Phys. Rev.

US/Pacific
Fuji (SLAC)

Fuji

SLAC

2575 Sand Hill Road Menlo Park, CA 94025 USA
Description
A nominally weekly meeting held on Tuesdays at 1:30 PM Pacific time to review the status of beam delivery system work.
We briefly discussed summary of ATF2 project meeting. Eric presented details of design and cost estimations of 1999 NLC beam dump. Yuri presented studies of power losses on collimators placed in front of beam dump versus radius of beam dump window. Alberto have shown first results for radiation in IR hall in case of self-shielding detector. A number of things in the model, which require modifications, were identified and studies will continue.
There are minutes attached to this event. Show them.
    • 13:30 13:45
      Brief summary of ATF2 project meeting 15m
      Speaker: Dr Thomas Markiewicz (SLAC)
    • 13:45 14:00
      NLC 1999 beam dump design 15m
      Speaker: Eric Doyle (SLAC)
    • 14:00 14:15
      Collimation in extraction and beam dump window size 15m
      Speaker: Yuri Nosochkov
      Slides
    • 14:15 14:30
      IR radiation physics study 15m
      Speaker: Alberto Fasso (SLAC)
      Slides