Beam Delivery System: General Discussion of RDR Plans

US/Pacific
Fuji (SLAC)

Fuji

SLAC

2575 Sand Hill Road Menlo Park, CA 94025 USA
Agenda 1) Meeting was devoted to general discussions and plans for RDR year. Participants reported about the progress. Slides (if were available) are attached. 2) Frank Jackson (Deresbury) described his work on optimization of collimation optics. Summary The group discussed the RDR (see slides) and plan of work for various tasks, including CF (see slides), conventional magnets, IR magnets, radiation physics tasks (see slides), background studies, feedback modeling, extraction kicker design, etc. Status of production of ATF2 quads was presented by Cherrill (see slides). Finally, Frank presented status and plans for optimization of optics of the betatron collimation. Andrei Seryi, 01/24/06
There are minutes attached to this event. Show them.
    • 1
      RDR Matrix
    • 2
      CF Requirements and CF Layout
      Speaker: Mr Fred Asiri (SLAC)
      Slides
    • 3
      Rad. Phys., etc
      Speaker: Lewis Keller (SLAC)
      Slides
    • 4
      ATF2 Quads
      Speaker: Dr Cherrill Spencer (SLAC)
      Slides
    • 5
      Collimation
      Speaker: Frank Jackson (Daresbury)
      Slides