3.9GHz Engineering meeting

US/Central
The Hermitage

The Hermitage

    • 3.9 GHz
      • 1
        Measurements of cavity No. 8 (Timer) -- status of cavity No. 7 (Foley)
      • 2
        Status of helium vessel bellows
        Speaker: JohnZ, Mitchell
      • 3
        Need for 4 bar pressure test of Cavity 1/Helium vessel
        Speaker: Foley
      • 4
        Status of TIG welder certification samples
        Speaker: Foley
      • 5
        Couplers
        Speaker: Olis
      • 6
        Other business
    • 1.3 GHz
      • 7
        Plan for testing AES-001
      • 8
        Nine-cell cavity for ANL
      • 9
        Niowave/Roark order/contact person/material problem
      • 10
        Report on Preliminary Results on Magneto-Electropolishing
        Speaker: Cooper
      • 11
        Other business
      • 12
        Plans for AES single-cell cavity processing
        Speaker: Champion