List of Issues/Tasks for ILD MDI/Integration

1. IR Issues/Tasks

1.1 IR design optimization with engineering studies

1.2 Background estimation

1.3 Relevant parameters for IR optimization

The relevant parameters are listed in a following table, where differences will be studied and tried to be understood.

GLD and GLDc
LDC
machine parameter set
1TeV, HiLum-1
nominal?
L* (m)
4.5
same in GLDc
4.3
B (Tesla)
3
3.5 in GLDc
4
RBe (cm)
1.5
z < 5cm
1.4
RVTX (cm)
2.0
FPCCD
1.6
VTX angular acceptance
|cos|<0.95
3 super-layers
|cos|<0.952
RFCAL (cm)
8
z = 2.3m
7.6
RBCAL (cm)
1 and 1.8
z = 4.3m
1.3
support tube
cantilever 70cm dia.
10cmt W-tube
cantilever 58cm dia.

Some parameters do not have the same meaning in GLD and LDC. For example Rin for TPC is the limit between TPC and SIT for LDC, in the case of GLD it is the inner radius of the sensitive part of the TPC, with the same definition LDC would be 36cm. We should first agree on definitions.

Common parameters have been suggested by the detector optimization working group as listed below.

Detector concept
GLD
LDC
GLD'
LDC'
TPC
Rin (m)
0.45
0.3
0.45
0.3
Rout (m)
2.0
1.58
1.8
1.8
Zmax (m)*
2.5
2.25
2.35
2.35
Barrel
ECAL
Rin (m)**
2.1
1.6
1.85
1.82
Material
Sci/W
Si-W
Sci/W
Si-W
HCAL
Material
Sci/W
Sci/Fe,Gas/Fe
Sci/W
Sci/Fe,Gas/Fe
Endcap
ECAL
Zmin (m)***
2.8
2.39
2.55
2.55
B-field (T)
3
4
3.5
3.5
VTX
inner layer (mm)
20
16
18
18

* GLD Zmax = 2.3 + 0.2m for TPC readout which has been included in LDC.
** LDC has less radial space between TPC and ECAL.
*** Fixed ECAL Zmin is proposed for well-defined TPC endplate region.

1.4 Beam pipe design

  1. Vertex chamber
    B-field, pair background, collimation depth ( synchrotron radiation profile at IP) and neutrons with BCAL as mask
  2. In front of FCAL
    Precise luminosity measurement with ;
  3. Pump
    Background should be studied including electro-hadronic production in addition to bremmstrahlung process between beam and residual gas.

1.5 Outer radius of support tube

  1. QD0 and SD0
  2. Thickness of tungsten tube
  3. Tracking in intermediate trackers between TPC and VTX

2. Detector Integration Issues/Tasks

2.1 Detector and its assembly on surface

2.2 Iron structure

2.3 Solenoid and cryostat design

2.4 How to support inner detectors and QD0

2.5 Opening, closing procedures

2.6 Underground hall requirements

3. Push-Pull Issues/Tasks

3.1 Re-commissioning machine operation

Re-commissioning process has been identified by T. Okugi (KEK) as listed below;
  1. initial alignment less than 1mm ( long, 3 mm )
  2. Beam Based Alignment (BBA) of QD0 relative to upstream beam line
  3. IP position scan for collision between 2 beams
    the major task and the most time consuming item !
  4. Luminosity scan by changing SD0 transverse position
  5. beam size tuning by sextupole (SD0, SF1) -knob

He suggested movers each for QD0,SD0 as well as QF1,SF1 .

3.2 Alignment of VTX and QD0

1mm displacement could happen. Is it tolerable ?
Or, fine adjustment system is needed in VTX ?

3.3 Slow settlement ( 100μm/month is tolerable ?)

Is it tolerable ?

3.4 Radiation, shielding around beam line

We could ask experts, e.g. T. Sanami (KEK), for estimation of self-shielding property of ILD .

3.5 Cryogenics system for solenoid, QD0

What, how and where ?

3.6 Commissioning during assembling/survicing detectors

stability, safety in the interference

3.7 Large platform scheme

H. Yamamoto suggested it in terms of stability and reproducibility.