4-th ML-SCRF meeting

GMT
Bld. 1, seminar room 1 (DESY)

Bld. 1, seminar room 1

DESY

Akira Yamamoto (KEK), Tetsuo Shidara (KEK)
Description
GDE SCRF technical area monthly meeting
Slides
    • 09:00 10:00
      Magnet associated with the Cryomodule
      • Beam-focusing and corrector magnet location and alignment
        • Requirement from accelerator system design? --- C. Adolphsen,
        • The location in cryomodule: center/end? --- C. Pagani,
        • How the magnet is to be aligned? -- N. Ohuchi,
        • Home work assignment
      • Beam Position monitor integrated with magnets
        • Requirement, --- C. Adolphsen,
        • Development status at Saclay/KEK --- O. Napoli/H. Hayano
        • Home work assignment
      slides
      slides
      slides
      slides
      slides
    • 10:30 12:00
      Critical components integrated with cavities
      • Coupler development and possible options
        • XFEL baseline coupler development and plan -- (from Orsay)
        • Current options and plug necessary compatibility -- H. Hayano
        • Home work assignment
      • Tuner
        • Overview of the current design options --- C. Pagani and L. Lilje
        • Comments on the current design options --- S. Noguchi
        • Necessary common conditions for further development --- H. Hayano
        • Home work assignment
      slides
      slides
      slides
      slides
      slides
    • 13:30 14:30
      Cryomodule design
      • Design and cost optimization, w/wo 5 K radiation shield

        • Design experience at TTF/XFEL with 5 K shield-- from DESY
        • Design experience at LHC (SC magnet) without 5 K shield--from CERN
        • Thermal balance and influence to cryogenic operation --T. Peterson
        • Home work assignment
      • Fundamental boundary-condition,

        • Common coordinates to be used-- N. Ohuchi and from DESY
        • Design pressure of the cryomodule and cavities
        • Required conditions and design base -- T. Peterson
        • Plan for the extreme pressure test from XFEL and STF-- from DESY
        • Homework assignment
      slides
    • 15:00 16:00
      Interface to cavities and to external/associated system
      • Interface to cavities and to external/associated system,

        • Single design for the baseline cost-estimate--N. Ohuchi/H. Carter
        • Plug compatible interface condition for alternate
        • Homework assignment
      • Further meeting plan and approach to reach consensus for EDR --

      slides