Topic: ILD MDI/Integration meeting
Date: Monday, February 18, 2008
Time: 5:00 pm, Japan Standard Time (GMT +09:00, Tokyo )
Meeting Number: 590 617 620
Meeting Password: kangei
Please click the link below to see more information, or to join the meeting.
-------------------------------------------------------
To join the online meeting
-------------------------------------------------------
1. Go to https://fnal.webex.com/fnal/j.php?ED=103262262=0 <https://fnal.webex.com/fnal/j.php?ED=103262262&UID=0>
2. Enter your name and email address.
3. Enter the meeting password: kangei
4. Click "Join".
-------------------------------------------------------
To join the teleconference only
-------------------------------------------------------
Provide your phone number when you join the meeting to receive a call back. Or, call the number below and enter the meeting number.
Call-in toll-free number (US/Canada): 866-469-3239
Call-in toll number (US/Canada): 650-429-3300
Global call-in numbers: https://fnal.webex.com/fnal/globalcallin.php?serviceType=MC=103262262=1 <https://fnal.webex.com/fnal/globalcallin.php?serviceType=MC&ED=103262262&tollFree=1>
Toll-free dialing restrictions: http://www.webex.com/pdf/tollfree_restrictions.pdf
Agenda
The idea is to check where we stay against the action items we had defined in Zeuthen and what else has been done, trying to monitor our progress for Sendai.
agenda
09:00
→
09:20
Status of ILD120m
Speaker:
DrToshiaki Tauchi(KEK)
Slides
09:20
→
09:30
Iron yoke10m
the shape
what material for the yoke: B-H curves
the field inside the TPC
The stray field at 10m adding 80 cm
Splitting of return yoke in z ( weight), and back part in 2 ( in x )
09:30
→
09:40
CAD systems10m
Most of Cad codes are compatible via step files. M. Jore
Sharing through Smarteam on the web. Access to the other intitutes.
09:40
→
09:50
State of the TPC questions10m
lot of exchange via emails, depending on readout technologies,
the endplates might correspond to 10 cm thickness and 10-15% of X0.
B-field
htm
Slides
09:50
→
10:00
Beam pipe10m
Some drawings of the beam pipe with different shapes are available on ilcild.org
Still calculations to be done regarding the thickness of the wall, the wakefield.
10:00
→
10:20
calorimeters and the integration issues20m
* 8/12 for calorimeters
* LHCAL / luminosity
* Pumping
* Holding the forward components
* Holding the inner detectors
* Assembly in the pit
* Opening schemes
10:20
→
10:50
Discussion30m
What can we hope to have for Sendai. Defining a planning for after Sendai:
what do we want to have when? a bit more organisation.