85th ATF2 weekly meeting

July 16 14:30- 16:30, ATF LC meeting room, KEK.

1. Decision of software task leaders ( discussion), Shigeru KURODA (KEK)

file , excel file

We discussed the task leaders with the draft list which has been prepared by S. Kuroda. In the list, the hardware direct tasks were separately listed from the beam tuning direct ones as decided at previous meeting. During discussion, it became clear that hardware direct tasks related to various feedback systems have no specific tasks while they are rather integrated hardware, so no leaders are needed for them.

We decided the leaders, i.e. one leader in each task, as the above excel file.

Also, we decided to have presentations of status, plan and schedule for each task by the leaders at next commissioning meeting, i.e. 30th July. Also, in next weekly meeting (23 July), we will have presentations of the hardware tasks on BPMs, movers and HA power supplies. We would like to know who and when are available at ATF, KEK in August through October, 2008.

KEK site meeting

2. Progress of Shintake monitor (ATF2 IP-BSM) work

file (Japanese), ppt, pdf (12 pages, 1.4MB)

Participants : Tauchi, Terunuma, Kuroda, Okugi, Araki, Oroku, Yamanaka and Kamiya(WebEx)

Laser system by T.Yamanaka

We changed a chiller for laser and seems to be no problem for cooling.
Q: Is temperture of cooling water really stable?
We would like to request for crane operation from September in order to ;
  1. insert shims between the vertical optical table and the horizontal table
  2. move the pulsed laser and the optical table to outside of the concrete shield
  3. replace rubber-adaptors by SUS ones between the laser optical table top and its mount .
Q: Do you prepare shims to be inserted?
A: No, we need to procure or make them by then.
Q: Do you really need the replacement of adaptors?
A: Although the vibration of the laser table doesn't affect the measurement so much, we want to prepare the optimum condition.
We would like to ask for the pulsed laser trigger consisting of following two;
  1. Flash Lamp
  2. Q-Switch
Possible solutions are as follows;

Detector of IP-BSM by M. Oroku

"What to do lists" were summarized and listed below;
  1. Simulation study of the analysis methods:
    ON/OFF method and Shot by shot method are considered for the Detector. It is important to perform simulation study changing S/N ratio. Then the proper analysis for the S/N ratio of IP-BSM can be chosen.
  2. Calibrations:
    Test the gain curve of photomultipliers
    Test the efficiency of light guides and scintillator
    Additional tests of position dependence of shower in the scintillator in more detail
  3. Monitoring system:
    It must be important to monitor gains of all 16 counters in the detector, although present detector has no such system. Accuracy and necessity of monitoring absolute values in addition to relative ones should depend on the detector performance and the analysis method. We would like to know them in details, expecting presentation at next meeting.
  4. timing system :
    How to make the trigger of IP-BSM
    candidates:
    a: use the timing system of Laser wire group
    b: construct the original system for IP-BSM