From: Colas Paul [paul.colas@cea.fr] Sent: Thu 7/10/2008 5:25 PM To: lctpc@desy.de; Pierre Lutz; BASSLER Ursula; Mur Michel; Ardellier-Desages Florence Cc: Stephen James Turnbull; Karolak Marc; franck.senee@cea.fr; thomas.chaminade@cea.fr; jean-marc.reymond@cea.fr; Francois Pierre; RIALLOT Marc; Yuri Kudenko Subject: [lctpc] Cosmic trigger setup up and running Attachments: View As Web Page The cosmic trigger setup assembled in Saclay for the EUDET TPC test facility has been installed at DESY around the PC-Mag magnet. The coincidence of 1 slab on the top, 1 at the bottom, and the set of 4 transverse slabs, yields a trigger rate of 0.7 Hz. The temperature is maintained at 20 degree by Peltier devices. It outputs a NIM, a TTL, or a LV-TTL signal. Thanks to all who contributed (in cc). Paul