3.9GHz status

UTC
The Hermitage

The Hermitage

    • 1
      Status of cavities 4, 5,6, 7 & 8
    • 2
      Cavity 3 horizontal test results
    • 3
      MP9 cavity string preparation (status of travelers, required tooling, overall plans, etc.)
    • 4
      ORC Documentation
      Speaker: H. Carter
    • 5
      Piping TIG welding
    • 6
      Other business