3.9GHz status

UTC
The Hermitage

The Hermitage

    • 09:00 09:15
      Status of cavity string assembly 15m
    • 09:15 09:30
      Documentation 15m
    • 09:30 09:45
      Status of 3.9 GHz Klystron at DESY 15m
    • 09:45 10:15
      Other business 30m
      Discussion ideal time for PM and MH coming for one week to FNAL performing a 3.9 GHz RF control kick off meeting. Is there an additional horizontal test of a 3.9 GHz cavity (fifths) planned in the next time? Of which kind is the 3.9 GHz RF control applied in A0 (at the nc cavity)?