Status of NML
-
Jerry
Status of NML
Jerry
09:00 - 09:20
09:20
R&D Plan and proposed schedule for the Design and Fabrication of Beta = 0.8 cavity
-
Nikolay and Vyacheslav
R&D Plan and proposed schedule for the Design and Fabrication of Beta = 0.8 cavity
Nikolay and Vyacheslav
09:20 - 09:40