We must prioritize the needed and/or desired capabilities of the LLRF systems for the 9mA studies in September, and we must assign work accordingly. A list of capabilities has been prepared, along with their respective benefits for the 9mA studies and the potential impact of them not being available. Also to be discussed will be the LLRF hardware options for ACC23 and ACC456
The goal of the meeting is to develop a prioritized list of work.