We have following three sessions at the 3rd ILD workshop; 2/16  15:30 - 17:30  2h : plenary 2/17  14:45 - 17:30  2h45m : parallel 2/18    9:00 - 10:00 1h : plenary I would like to suggest possible agenda as listed below; --------- 2/16  15:30 - 17:30  2h 1. Integration -  assembling and supports/integration of sub-detectors   (1-1) iron structure, coil, CALs  by U.Schneekloth      (gaps for cables, services)   (1-2) inner trackers, beam pipes and forward region by  M.Jore      (supports, gaps for cables, services)    (1-3) rigidness in the assembling by H.Yamaoka      (support at the central ring ) 2. Magnet, coil, cryostat design  by F.Kircher 3. Beam pipe :   (3-1) wakefield etc. , by Y.Suetsugu   (3-2) design principle, by H.Videau or M.Anduze or M.Jore 2/17  14:45 - 17:30  2h45m 1. Iron yokes,  coil,  beam pipe, shielding,  experimental hall,    (1-1) iron endcap yoke with rectangular hole by M.Jore    (1-2) sliding shields around the beam line, K.Sinram    (1-3) self-shielding property, T.Sanami 2. support tubes :    (2-1) Circular/rectangular tube and pillar by  H. Yamaoka 3. consistency of dimensions by C.Clerc 4. 3D CAD system  by M.Jore 5. CATIA system by M.Anduze 6. discussion on future plan after the LoI  - list of R&Ds     beam pipe of  all Be structure ?, welding, shape of cone  etc     push-pull issues:         - fully flexible high pressure pipe line,  by A. Yamamoto         - cold-box in cooling during the push-pull  by A. Yamamoto         - vibration-proof platform,  A.Herve     coil  - new metal, A.Herve (CMS), K.Tanaka(KEK) 7. some joint sessions with calorimeter group and TPC as well 2/18    9:00 - 10:00 1h 1. Push pull issues :    time schedule of operation    what services are needed  at side of detector on the platform ?        - low voltage system, gas circulation?        - racks or electronics hut    alignment - Monalisa for QD0, ones for sub-detectors?    calibration 2. MDI in the LoI 3. Summary of R&Ds ------- Nominal time slot of presentation is 20 minutes with Q&As. Brief explanation of agenda ; First, we should present the overall integration status and call attention to sub-groups for integration ( support method, cables, services etc.) and magnet, beam pipes. In the parallel session, we will discuss each issues in details and possible R&Ds after the LoI.  If necessary, we may have joint sessions with major sub-detectors such as calorimeters, TPC and FCAL. In the last session, we will summary the parallel session and focus on the push pull issues and the R&Ds.