3.9GHz status

UTC
The Hermitage

The Hermitage

    • 09:00 09:15
      Status of cold mass assembly -- success of weld repair 15m
    • 09:15 09:30
      Cavity 6 test results 15m
    • 09:30 09:45
      Cavity 4 schedule 15m
    • 09:45 10:00
      Other business 15m
      Discussion ideal time for PM and MH coming for one week to FNAL performing a 3.9 GHz RF control kick off meeting. Is there an additional horizontal test of a 3.9 GHz cavity (fifths) planned in the next time? Of which kind is the 3.9 GHz RF control applied in A0 (at the nc cavity)?