Participants: Tauchi, Terunuma, Okugi, Kuroda, Kubo, Toge, Kamiya, Oroku, Yamanaka
Time: 16:00(JST)~
* Collimator Layout
- There's no problem with that design.
- It may be better to add movable lead shield.
* Cherenkov Detector
- There are errors in the report at last week.
- The Compton signal resolution becomes the best when the
lead conver thickness is about 2.5 mm.
- The cosmica ray signal was observed with newly fabricated Cherenkov
Detector, however there ware large amout of noize.
* Phase Stability
- The phase stability measurement was performed to check MONALISA's
influence to the optics of the Shintake Moitor.
* For the Autumn Beam Run
- need to make a simulation during the beam time
- should prepare wire scanner at the IP (10 um vertical metal wire)
- If two BPMs are prepared around IP, it may be farely easy to align the beam
angle for the detector for the Shintake monitor.