ATF2 weekly meeting
→
Asia/Tokyo
-
-
14:30
→
15:30
International phone/webex meeting
- 14:30
- 14:50
-
15:10
Quick test results of Monalisa at IP, ATF2 20mSpeakers: Dr David urner (University of Oxford), Dr Paul Coe (John Adams Institute for Accelerator Science, University of Oxford)
-
15:30
→
16:30
KEK site meeting (Japanese)
-
15:30
Progress of Shintake monitor work 20mSpeakers: Mr Masahiro OROKU (Tokyo Univ.), Mr Takashi Yamanaka (The University of Tokyo)Participants: Tauchi, Terunuma, Okugi, Kuroda, Kubo, Oroku, Yamanaka, Kamiya(WebEx) Time: 16:30(JST)~ * Screen Monitor and Knife Edge - add tungsten wire scanner for vertical beam size measurement at the IP - better to attach several wires - Wires should be attached to the end so that easily incerted * Background Photon Reproduction with Computer Simulation - It seems not to be a important issue. - Rather, it may be useful to study SAD calculation * MONALISA installation - Regaring the phase stability, the MONALISA system doesn't affect so much to the Shintake monitor. - However, it is the urgent task to measure beam size with the interference mode. So it is desired to install the MONALISA after the confirmation of this measurement. * Chamber Replacement at the Final Bending Magnet - Originally, the chamber in stock is planed to be altered to have larger aperture. - Because of the residual radiation of that chamber, the new chamber becomes necessary * Phase Stability - 1 minute phase stability is within tolerance (smaller than table vibration) - It is desired to find out the reason why the phase drifts in long term.
-
15:30
-
14:30
→
15:30