ATF2 weekly meeting
→
Asia/Tokyo
-
-
14:00
→
16:00
International phone/webex meeting
- 14:00
- 15:00
- 15:10
- 15:30
-
15:50
→
16:50
KEK site meeting (Japanese)
-
15:50
Progress of Shintake monitor work 20mSpeakers: Mr Masahiro OROKU (Tokyo Univ.), Mr Takashi Yamanaka (The University of Tokyo)Site: KEK ATF LC Container Time: 16:00(JST) ~ Participants: T. Tauchi, N. Terunuma, J. Urakawa, T. Okugi, S. Kuroda, K. Kubo, P. Bambade, S. Boogert, A. Aryshev, T. Yamanaka, Y. Kamiya(WebEX) * Modification of the IP target insertion stage C: Support of the stage using screws should be three. Micrometers won't be able to bear the preassure from vacuum * Detector Interlock C: When the PMT signals are used to interlock the HV to the detector, You should use a discriminator rather than charge ADC reading. If the gate signal to the ADC is not adjusted, it is probable to miss the high current signal. Q: If the local machine is stopped by some troubles, HV state cannot be changed and screen monitors cannot be inserted? A: In this case, they can be movable by changing the EPICS record forcibly. C: In practice, PLC should be used instead of a PC to make the system reliable. Q: How long does it take to stabilize HV after swtching on? A: If the HV is not so high, it takes 5 minitues or so. C: If screen monitors and wire scanners are used often, that period becomes a waste of time. If you can prepare a movable lead block, it will be better than HV interlock. (HV interlock should be also prepared.) * Laser Replacement C: Is one day enough to set up a new laser? If a company can make it, you should prepare plenty of time (from the afternoon of September 24) for laser set up.
-
15:50
-
14:00
→
16:00