From: Li Yulan [yulanli@mail.tsinghua.edu.cn] Sent: Fri 7/3/2009 3:45 AM To: lctpc@desy.de Cc: Yulan Li Subject: [lctpc] Projects and Testbeam needs for Central Tracking (TPC) in 2010 - 2013 Attachments: 1st-prepatorial-meeting_LYL_2009_05_26_rsfeedback.pdf(299KB) View As Web Page Dear colleagues? The webpage for the "Linear Collider Testbeam Workshop" did get ready, and is now open for the registration (see http://events.lal.in2p3.fr/conferences/LCTW09/ for detail). For us LCTPC group, we need to figure out our need (roughly?) for test beam in 2010 - 2013. The 2nd prepatorial meeting is proposed on 17/7/09. I need to present the update on TPC efforts. This time, I hope we have enough time to discuss on it. For your reference, I attached the talk which I had at the first prepatorial meeting. ????? Best regards. Li Yulan -------------------------------------------------- Lab. of Radiation Physics & Detection Technology Dept. of Engineering Physics Tsinghua University Beijing, 100084 P. R. China Tel: 86-10-62781327 yulanli@mail.tsinghua.edu.cn ---------------------------------------------------- 2009-07-03