Second ATF2 Project Meeting
→
Asia/Tokyo
Meeting room, 1F, 3-gokan (KEK)
Meeting room, 1F, 3-gokan
KEK
Tsukuba, Japan
Description
We will review the status and discuss the planning details for ATF2 in 2006.
The first meeting was held at SLAC, 3-5 February 2006, whose homepage is
http://www-project.slac.stanford.edu/ilc/meetings/workshops/ATF2/feb2006/ .
General information on ATF and ATF2 is available at http://atf.kek.jp/index_skip.html and http://atf.kek.jp/collab/md/projects/project_atf2.php .
-
-
1
Greeting by J. Urakawa¶
-
2
Overview and meeting plan by T.Tauchi and A. Seryi¶
-
3
Final optimization of optics by M.Woodley¶
-
4
Summary of tolerances for magnets by S.Kuroda¶
-
5
Layout and conventional facility by J.Urakawa and N.Terunuma¶
-
6
Optimization of the band width by A.Seryi¶
-
7
Discussion¶
-
8
CLIC table for the FD system by P.Bambade¶
- 9
-
10
Active supports for the FD system and Shintake monitor by R. Sugahara¶
-
11
Passive support for Shintake monitor by T. Kume¶
-
12
Stabilization between the above two ( by StaFF ), by D.Urner¶
-
13
Discussion¶
-
14
Design of Magnets: FD, Bends, Sextupoles , by C.Spencer¶
-
15
Field measurement of QEA magnets, by M.Masuzawa¶
-
16
Magnet support system, by R.Sugahara¶
-
17
Vibration measurement of FFTB movers, by H.Yamaoka¶
-
18
QBPM and IP-BPM, by Y.Honda¶
-
19
Electronics, by M.Ross¶
-
- 20
-
21
Specification of bulk power supply, module and controller etc. by P.Bellomo¶
-
22
Role sharing between KEK and SLAC , by M.Kumada¶
-
23
Laser facility for photon collider by T.Takahashi¶
-
Production and Installation Policy (3)¶
Laser, feedback/feedforward session by T.Takahashi,G.Blair,P.Burrows,T.Suehara, Y.Honda
-
24
Fast feedback(FONT) and feedforward system by P.Burrows¶
-
25
Laserwire system by D.Howell¶
-
26
Shintake monitor by T.Suehara¶
-
27
Resonant cavity type monitor for future option by Y.Honda¶
-
28
Feeback and feedforward systems by P. Burrows¶
-
29
Fast kicker for the ILC bunch train structure by T. Naito¶
-
30
Laser-wire by G.Blair¶
-
31
Shintake System by T.Suehara¶
-
32
IP-BPM and BSM with laser cavity by Y. Honda¶
-
33
Discussion¶
-
-
34
R&D program at ATF during the ATF2 construction, by P.Burrows¶Discussion, may need agreement - proposal to the ICB?, Vancouver, July 2006?
-
35
Laserwire by G.Blair¶
-
36
Cavity BPM by Y. Honda¶
-
37
MonALiSA by D.Urner¶
-
38
Compton laser cavity, by T.Omori¶
-
39
ODR by P.Karataev¶
-
40
Magnet and Support, by C.Spencer, R.Sugahara (M.Ross)¶
- 41
-
42
Powe Supply, P.Bellomo, M.Kumada (M.Ross)¶
-
43
Laser, feedback/feedforward, by Y.Honda (M.Ross)¶
-
44
Optics and Layout, by A.Seryi¶
-
45
IP configuration, by P.Bambade¶
-
46
Commissionng Detailed Plan, by T.Okugi¶
-
47
Scheduling Strategy, by G.Blair¶
-
48
ATF operation during construction and extraction line modifications, by P.Burrows¶
-
49
Production and Installation Policy Session by M.Ross¶
-
Closed session on budgets¶
KEK, SLAC, EU, K.Yokoya,J.Urakawa,T.Tauchi,A.Seryi,G.Blair,P.Bambade, etc.