Second ATF2 Project Meeting

Asia/Tokyo
Meeting room, 1F, 3-gokan (KEK)

Meeting room, 1F, 3-gokan

KEK

Tsukuba, Japan
Description
We will review the status and discuss the planning details for ATF2 in 2006. The first meeting was held at SLAC, 3-5 February 2006, whose homepage is http://www-project.slac.stanford.edu/ilc/meetings/workshops/ATF2/feb2006/ . General information on ATF and ATF2 is available at http://atf.kek.jp/index_skip.html and http://atf.kek.jp/collab/md/projects/project_atf2.php .
    • Registration
    • 1
      Greeting by J. Urakawa
      Slides
    • Introduction
    • 2
      Overview and meeting plan by T.Tauchi and A. Seryi
      Slides
    • 3
      Final optimization of optics by M.Woodley
      Slides
    • Optics and Layout

      Finalization of the optics, layout including conventional facilities

    • 4
      Summary of tolerances for magnets by S.Kuroda
      Slides
    • 5
      Layout and conventional facility by J.Urakawa and N.Terunuma
      Slides
    • 6
      Optimization of the band width by A.Seryi
      Slides
    • 7
      Discussion
    • Lunch
    • 8
      CLIC table for the FD system by P.Bambade
      Slides
    • IP configuration
    • 9
      IP Layout by T.Okugi
      magnet configuration, QBPMs, beam pipe, movers
      Slides
    • 10
      Active supports for the FD system and Shintake monitor by R. Sugahara
      Slides
    • 11
      Passive support for Shintake monitor by T. Kume
      Slides
    • 12
      Stabilization between the above two ( by StaFF ), by D.Urner
      Slides
    • 13
      Discussion
    • coffee break
    • 14
      Design of Magnets: FD, Bends, Sextupoles , by C.Spencer
    • Production and Installation Policy (1)

      Magnet and support session,
      BPM session

    • 15
      Field measurement of QEA magnets, by M.Masuzawa
      Slides
    • 16
      Magnet support system, by R.Sugahara
    • 17
      Vibration measurement of FFTB movers, by H.Yamaoka
      Slides
    • 18
      QBPM and IP-BPM, by Y.Honda
      Slides
    • 19
      Electronics, by M.Ross
    • Commissioning detailed plan
    • 20
      Hardwares for the commisioning by T. Okugi
      discussion
      Slides
    • coffee break
    • Production and Installation Policy (2)

      Power supply session by P.Bellomo, M.Kumada

    • 21
      Specification of bulk power supply, module and controller etc. by P.Bellomo
      Slides
    • 22
      Role sharing between KEK and SLAC , by M.Kumada
      Slides
    • Lunch
    • 23
      Laser facility for photon collider by T.Takahashi
      Slides
    • Production and Installation Policy (3)

      Laser, feedback/feedforward session by T.Takahashi,G.Blair,P.Burrows,T.Suehara, Y.Honda

    • 24
      Fast feedback(FONT) and feedforward system by P.Burrows
    • 25
      Laserwire system by D.Howell
      Slides
    • 26
    • 27
      Resonant cavity type monitor for future option by Y.Honda
      Slides
    • coffee break
    • 28
      Feeback and feedforward systems by P. Burrows
      Slides
    • Scheduling strategy

      for installation of monitors and feedback/forward system etc.

    • 29
      Fast kicker for the ILC bunch train structure by T. Naito
      Slides
    • 30
      Laser-wire by G.Blair
      Slides
    • 31
      Shintake System by T.Suehara
      Slides
    • 32
      IP-BPM and BSM with laser cavity by Y. Honda
      Slides
    • 33
      Discussion
    • Banquet

      Japanese food, at Cranberry restaurant, KEK