Summary:
This report contains brief status of:
1) damping ring kicker RD, in collaboration with ATF and LLNL
2) damping ring BPM RD to upgrade the ATF ring system
3) ATF2 extraction line cavity BPM electronics testing and production
4) TTF HOM BPM signal analysis
5) TTF HOM Beam phase monitor initial results
6) ESA / LCLS bunch length monitor RD