IPBPM installation meeting

Asia/Tokyo
Description
The location is a test space between QM16FF and QF21X on the granite table, where the tilt monitor was installed .
meeting summary
    • 1
      Proposal of the IPBPM installation in January 2010
      The slides are the same as those presented at the 9th ATF2 project meeting, 15 December 2009.
      Speaker: Dr Yosuke Honda (KEK)
      Slides
      • a) Beam orbit and jitter in vertical direction at the ATF2 beam line
        The data were presented by S.Boogert at the 9th ATF2 project meeting.
        Slides