AD&I Meeting: Parameters and options for reduced power
Friday 23 July 2010 -
15:00
Monday 19 July 2010
Tuesday 20 July 2010
Wednesday 21 July 2010
Thursday 22 July 2010
Friday 23 July 2010
15:00
Configurations and running scenarios
-
Nicholas Walker
(
DESY
)
Configurations and running scenarios
Nicholas Walker
(
DESY
)
15:00 - 15:15
Introduction summarising current status of possible baseline configurations and operations scenarios. Included will be <ul> <li>Scope of baseline modifications for low the low power option (rationale) <li>Brief recap of low Ecm operation status (10Hz meeting) <li>Risk mitigation (maintaining options) </ul>
15:15
Proposed machine parameters
-
Andrei Seryi
(
SLAC
)
Proposed machine parameters
Andrei Seryi
(
SLAC
)
15:15 - 15:30
Presentation and discussion on parameter tables for Ecm = 200, 250, 350 and 500 GeV. Working assumptions etc. and areas of risk requiring further study and/or R&D.
15:30
Physics and Detector Issues
-
Jim Brau
(
U. Oregon
)
Physics and Detector Issues
Jim Brau
(
U. Oregon
)
15:30 - 15:45
Recap of SB2009 physics impact (status). Outstanding issues and questions concerning either physics reach or detector operation. Near term plans for further studies leading up to the BAWs.
15:45
Status of BAW planning
-
Marc Ross
(
FNAL
)
Status of BAW planning
Marc Ross
(
FNAL
)
15:45 - 16:00
<ul> <li>BAW-1 (September 2010) planning, specifically issues relating to either low-power or 10Hz operation (HLRF) <li>BAW-2 (January 2011): Proposal for announcement and tentative programme (discussion). </ul>
16:00
Cost increment update
-
Peter Garbincius
(
FNAL
)
Cost increment update
Peter Garbincius
(
FNAL
)
16:00 - 16:15
Update/review of cost increment associated with low-power operation (with respect to RDR).
16:15
General discussion and future plans
-
All
General discussion and future plans
All
16:15 - 16:30