Stability Study in ATF/ATF2 task force

Asia/Tokyo
Kiyoshi Kubo (KEK), Stewart Boogert (Royal Holloway, University of London)
Description
To clarify are we need to have goals for the hardware projects and how these projects help achieve goal 2. So given the state of the hardware development and achieving goal two Our work is essentially to prepare the hardware systems and ideas to be deployed during the 2011-2012 operations year. Also, the DR stability issue is included.
    • task force session
      Main discussion was upstream installation of KNU IPBPM, KEK BPM 2 KEK blocks available but no electronics 2 x-y movers available, that can support the mass Issues raised Wakefields : assumed not problematic provided cavities are well centered. Electronics : Old nanoBPM and possibly new C-band electronics available
      • 1
        Introduction
        Speaker: Dr Stewart Boogert (Royal Holloway, University of London)
        Slides