ATF2 beam tuning

Asia/Tokyo
ATF Control Room (Universe)

ATF Control Room

Universe

Description
General Shift Plan for Continuous Run,i.e. 6 shifts/week in March 2011 Names in blue are fixed, while the others must be fixed according to beam tuning plan in shifts. Persons in "ATF2 beam" are shift leaders in the ATF2 beam tuning, who are responsible of deciding tuning procedures and reporting the shift summary and suggestion to next shift. Before the ATF2 continuous shifts, following conditions should be satisfied; (1) All hardware and software are ready, i.e. well-calibrated, (2) Extraction beam line is tuned; optics corrections, background reduction, (3) Beam tuning is ready at the final focus system with the IPBSM We will try to minimize the beam size in every continuous shifts.
ATF2 Shift Plan in March, 2011