Dr
Barry Barish
(GDE)
07/11/2011, 09:00
• Tera scale physics
• ILC and LHC
• Layout of the ILC
• Parameter choices & optimization
• Other possible future lepton colliders: CLIC and the muon collider
• Detectors
Dr
Barry Barish
(GDE)
07/11/2011, 14:00
• e- and e+ sources
• Bunch compressors and spin rotators
• Damping rings
• Main linac
• Beam delivery system
• Civil construction issues
Frank Tecker
(CERN)
08/11/2011, 09:00
• Klystron vs. beam driven acceleration
• CLIC layout
• Parameter choices & optimization
• Driver beam stability
• Comparison of the CLIC and ILC
• Technical challenges
Hermann Schmickler
09/11/2011, 14:00
Walter Wuensch
10/11/2011, 09:00
Daniel Schulte
(CERN)
11/11/2011, 09:00
Walter Wuensch
11/11/2011, 09:00
Daniel Schulte
(CERN)
11/11/2011, 14:00
Walter Wuensch
11/11/2011, 14:00
Dr
John Sheppard
(SLAC)
12/11/2011, 09:00
Walter Wuensch
12/11/2011, 09:00
Schuichi Noguchi
(KEK)
12/11/2011, 14:00
Yunhai Cai
(SLAC)
13/11/2011, 09:00
Shuichi Noguchi
(KEK)
13/11/2011, 09:00
Yunhai Cai
(SLAC)
14/11/2011, 09:00
Shuichi Noguchi
(KEK)
14/11/2011, 09:00
Yunhai Cai
(SLAC)
14/11/2011, 14:00
Dr
Shuichi Noguchi
(KEK)
14/11/2011, 14:00
Yunhai Cai
(SLAC)
15/11/2011, 09:00
Dr
Stefan Simrock
(DESY)
15/11/2011, 09:00
Prof.
Andrei Seryi
(John Adams Institute)
15/11/2011, 14:00
Dr
Stefan Simrock
(DESY)
15/11/2011, 14:00
Prof.
Andrei Seryi
(John Adams Institute)
16/11/2011, 09:00
Dr
Stefan Simrock
(DESY)
16/11/2011, 09:00