HLRF Technical System Weekly Meeting

US/Pacific
SLAC: SCS 115, 3-5PM PDT (High Level RF TS Review)

SLAC: SCS 115, 3-5PM PDT

High Level RF TS Review

Description
1. Review status of major HLRF subsystem, components in Baseline Conceptual Design. 2. Review progress of RDR Cost Modeling and Estimates, resource assignments, standard methodologies. 3. Review R&D progress for Alternate Conceptual Designs.
    • 03:00 03:15
      Agenda & Goals 15m
      Speaker: Raymond Larsen (SLAC)
      Paper
    • 03:15 03:30
      KEK Progress 15m
      Speaker: Dr Shigeki Fukuda (KEK)
      document
      Slides
    • 03:30 03:45
      Main Linac & Klystron Status 15m
      Speaker: Chris Adolphsen (SLAC)
    • 03:50 04:05
      Distribution System Progress 15m
      Speaker: Dr Chris Nantista (SLAC)
    • 04:05 04:15
      Waveguide 3D Modeling 10m
      Speaker: Jerry Leibfritz
    • 04:15 04:30
      Distribution Costs 15m
      Speaker: Mike Neubauer (SLAC)
    • 04:30 04:45
      Modulator Progress 15m
      Speaker: Chris Jensen (FNAL)
    • 04:45 05:00
      Controls/Interlocks/Protection Status 15m
      Speaker: Richard Cassel (SLAC)