Conveners
Status for the 2nd goal preparation
- Philip Bambade (Laboratoire de l''Accelerateur Lineaire (LAL) (IN2P3) (LAL))
-
Mr Siwon Jang (KNU)25/01/2013, 16:00Electronics, beam test results, planningGo to contribution page
-
Mr Sandry WALLON (LAL-CNRS)25/01/2013, 16:20Vacuum test, 3D measurement, pre-alignment and mounting fixtures, schedule for shippingGo to contribution page
-
Mr Frédéric Bogard (LAL)25/01/2013, 16:40Vacuum test, performance & calibration, thermal sensors, cablingGo to contribution page
-
Prof. Philip Burrows (Oxford University)25/01/2013, 17:00