Miscellanous GDE Meetings - Vancouver

GMT
Description
This agenda is for the various GDE meetings that are closed sessions.
Support
    • 08:30 18:00
      CF&S Group SUB 207

      SUB 207

    • 14:00 21:00
      Cost Engineers SUB 213

      SUB 213

      Cost Discussion with RDR Mgmt will begin at 17:00.

    • 14:00 18:00
      RDB SUB 211

      SUB 211

      R&D Board

    • 08:30 17:30
      Cost Review Group Gage M1

      Gage M1

      Closed Session

      • 08:30
        Damping Rings (with RF, Cryo, LBL Vacuum) 50m
        This meeting is by invitation only.
      • 11:10
        Main Linac (with RD, Cavities, Cryomodules, LLRF) 1h 20m
        This meeting is by invitation only.
      • 14:00
        CF&S 2h
        This meeting is by invitation only.
      • 16:30
        e+ Source (with commissioning, operations, reliability) 1h
        This meeting is by invitation only.
    • 12:30 13:30
      EC Meeting SUB 215

      SUB 215

      Lunch with RDR Mgmt

    • 17:30 18:00
      DCB Gage M1

      Gage M1

    • 08:30 17:30
      Cost Review Group Gage M1

      Gage M1

      Closed Session

      • 08:30
        Executive Commitee 1h
      • 09:30
        e- Source 15m
      • 09:45
        RTML 15m
      • 10:00
        break 30m
      • 10:30
        BDS (with magnets, dumps) 1h
      • 11:30
        Magnets 15m
      • 11:45
        Commisioning, Operations, Reliability 15m
      • 12:00
        Installation 15m
      • 12:15
        Instrumentation 15m
      • 13:30
        Cryogenics 15m
      • 13:45
        Controls 15m
      • 14:00
        Vacuum 15m
      • 14:15
        Accelerator Physics 15m
    • 08:30 09:30
      EC/Cost Engineers Gage M1

      Gage M1

      Closed Session

    • 12:30 13:30
      EC Meeting SUB 215

      SUB 215

    • 13:30 14:30
      ATF/ATF2 Gage M3

      Gage M3

    • 14:00 18:00
      RDB Gage RB

      Gage RB

      R&D Board

    • 15:00 19:00
      Ozaki Panel Henn 301

      Henn 301

    • 15:30 19:30
      CCB Gage M2/3

      Gage M2/3

      Change Control Board

    • 17:30 18:00
      DCB Gage M1

      Gage M1

    • 07:30 08:30
      ILC Communicators

      Meeting w/ Barry
      Location - TBA

    • 08:30 17:30
      Cost Review Group Gage M1

      Gage M1

      Closed Session

    • 08:30 09:30
      GDE/ALCPG Parallel Session SUB 212A

      SUB 212A

      GDE BDS to meet with WWS MDI panel. This is part of the BDS parallel session.

    • 08:30 09:30
      RDR Writing Gage M2/3

      Gage M2/3

      RDR and BCD
      RDR Report Discusssion
    • 09:30 10:30
      GDE/ALCPG Parallel Session Gage M1

      Gage M1

      GDE RDR editors to meet with DCR editors to discuss coordination of the RDR and DCR.

    • 10:30 12:30
      S2 task Force Gage M2/3

      Gage M2/3

      • 10:30
        Kubo: length needed for beam test 15m
        Slides
      • 10:45
        Nagaitsev: Fermilab ideas for ILC test linac 15m
        Slides
      • 11:00
        Toge: Reliability evaluation and comments 10m
        Slides
      • 11:10
        Himel: previous industrialization efforts 15m
        Slides
      • 11:25
        Kephart: An ILC industrialization plan 20m
        more information
        Slides
      • 11:45
        Padamsee: Update on timelines fom TTF, STF and SMTF 10m
        Ran out of time, so talk not given. Slides here anyway
      • 11:55
        General discussion 35m
        General discussion of our task force plans and informal progress reports. A piece of this discussion will be a brain storming session to list reasons we might want a string test facility. That is, what things do we need to test that require such a facility.
    • 12:30 13:30
      EC Meeting SUB 215

      SUB 215

    • 13:30 17:30
      CCB Gage M2/3

      Gage M2/3

      Change Control Board

    • 13:30 17:30
      EDMS Henn 301

      Henn 301

    • 13:30 14:30
      GDE/ALCPG Parallel Session SUB 212

      SUB 212

      GDE RDB to meet with WWS R&D Panel.
      Topic:GDE RDB role in detector R&D program.

    • 13:30 14:30
      GDE/ALCPG Parallel Session SUB 212A

      SUB 212A

      GDE EC to meet with DCR editor.
      Topic: Coordination of machine performance and detector performance specs.

    • 14:30 15:30
      GDE/ALCPG Parallel Session SUB 212

      SUB 212

      GDE Cost Engineers to meet with Cost Concept and WWS co-chairs.
      Topic: Coordination of machine and detector costing methodologies.

    • 14:30 15:30
      GDE/ALCPG parallel Meeting SUB 212A

      SUB 212A

      GDE EC and BDS group leaders to meet with WWS-OC. Topic: Issues related to the numbers of IR's.

    • 16:00 17:30
      EC/ Cost Engineers Gage M1

      Gage M1

    • 08:30 17:30
      Cost Review Group SUB 211

      SUB 211

      Closed Session

    • 12:30 13:30
      EC Meeting SUB 215

      SUB 215

    • 14:00 18:00
      RDB SUB 215

      SUB 215

      R&D Board

    • 18:00 23:00
      DCB SUB 213

      SUB 213

      Design Cost Board

    • 08:30 12:30
      DCB SUB 212

      SUB 212

      Design Cost Board