Attending: Andy, Chris D., Chris P., Dan, Jim, Marty
Minutes:
- Informal discussion regarding the merits and feasibility of FCCee/hh
- Jim presented a brief update of the MAPS studies - currently two undergrad students are working on this;
- A link to the ECFA slides presented by D. Jeans can be found here.
- The beam pipe is not included in the SiD_o2_v03 model (it is commented out in the XML). How much does it matter? Should discuss with Jan (via email).
- No serious engineering studies have been carried out regarding the gaps and/or supports between detectors in ECal (or MAPS); can these be actually built? Some studies would be needed at some point.
Next meeting: February 23, 2022
There are minutes attached to this event.
Show them.