PAC
The Project Advisory Committee (PAC) will review both ongoing technical R&D and design work of the GDE through the Technical Design Phases as well as that of the detector community as they evaluate LOIs.
December 2012
- 12 Dec - 14 Dec
-
11 Dec - 13 Dec
ILC-PAC - KEK Pre Meeting Review Page (protected)