3.9GHz Engineering meeting

US/Central
The Hermitage

The Hermitage

Slides
    • 09:00 09:30
      1.3 GHz
      • 09:00
        RRR specification -- AES problems with ISO auditor 10m
        Speaker: Champion, Foley
      • 09:10
        Proposed review procedure for cavity orders 5m
        Speaker: Foley
      • 09:15
        IB4 material inventory control 5m
        Speaker: Foley
      • 09:20
        Nb55Ti for AES single-cell order 5m
        Speaker: Foley
      • 09:25
        Single-cell cavities to be fabricated at FNAL -- status of blanks from DESY and HC Stark 5m
        Speaker: Cooley
    • 09:30 10:00
      3.9 GHz
      • 09:30
        Status of Helium vessels 10m
        Speaker: Mitchell, Foley
      • 09:40
        Schedule for vertical test of cavity 6 5m
        Speaker: Rowe
      • 09:45
        Options for fabricating cavities 7 & 8 5m
        Speaker: Foley
      • 09:50
        Other business 10m