Main Linac - KOM
→
GMT
Fish Tank (FNAL)
Fish Tank
FNAL
Wilson Hall 13th floor
Chris Adolphsen
(SLAC)
Description
-
-
Beam Related Issues
-
1
Quad Package (Quad, Correctors, BPM, HOM Absorber)Speaker: Nikolay Solyak et al
- 2
-
15:00
Coffee Break
- 3
- 4
-
1
-
Introduction, Test Facilities and ACD Time Lines
- 5
- 6
- 7
- 8
-
10:10
Coffee Break
- 9
- 10
- 11
- 12
-
Lunch
-
-
-
Integration Issues
This session is to allow people to present issues than span technical groups, including CFS and LLRF
- 13
-
14
Coupler Diameter, Multipacting and TunabilitySurveys pros and cons of different coupler choicesSpeaker: Chris Adolphsen
- 15
- 16
-
10:20
Coffee Break
- 17
- 18
- 19
-
Lunch
-
Cost and Design Optimization
- 20
- 21
-
14:30
Coffee Break
-
22
Main Linac Cost Summary, Drivers and Technical and Cost RisksSpeaker: Tetsuo Shidara
- 23
-