3.9GHz Engineering meeting

US/Central
The Hermitage

The Hermitage

Minutes
    • 1.3 GHz
      • 1
        RRR test results on "drop offs" from cells 3, 5 and 7 of AES-001
        Speaker: Cooley
      • 2
        Plans to have JLab X-ray NbTi used on AES cavity flanges
        Speaker: Foley
      • 3
        Requirement for inclusion of attachment rings on single-cell cavities -- Americanization of DESY drawings
    • 3.9 GHz
      • 4
        Status of cavities 7 and 8
        Speaker: Foley
      • 5
        Single-cell cavity fabrication status and plans
        Speaker: Foley
      • 6
        Helium vessel issues -- material and welder certification -- procedure -- testing, etc.
        Speaker: Helen, Mitchell, Champion, etc
      • 7
        Single-cell cavity test results
        Speaker: Genfa
      • 8
        Plasma processing plan for 3.9 GHz
        Speaker: Genfa
    • OTHER BUSINESS
      • 9
        1.5 GHz single-cell cavity from "bad" material
        Speaker: Genfa