5–6 Sept 2007
DESY Hamburg
Europe/Zurich timezone

Session

Forward Region

0
5 Sept 2007, 13:00
DESY Hamburg

DESY Hamburg

Description

Introduction
LDC V5
Current Opening Scenario
* Support Tube
* Length/Position Shielding Tube
LumiCAL
* Support LumiCAL
* Installation LumiCAL
BeamCAL
* Position BeamCAL (Constrains etc.)
Vacuum
* Pump
* Valves
* Flanges

Presentation materials

There are no materials yet.

  1. 05/09/2007, 13:00
  2. H.Videau
    05/09/2007, 13:20
  3. W.Wierba
    05/09/2007, 14:00
  4. S.Schuwalow
    05/09/2007, 14:30
  5. H.Videau
    05/09/2007, 15:30
    created by M.Anduze
    Go to contribution page
  6. 05/09/2007, 15:50
Building timetable...