3.9GHz Engineering meeting

US/Central
The Hermitage

The Hermitage

Minutes
    • 09:00 10:00
      1.3 GHz
      • 09:00
        Report on trip to observe AES equator welds 15m
        Speaker: Foley
      • 09:15
        Comments on schedule/results for measurements and/or tests 30m
        Comments on schedule/results for the following measurements and/or tests: (a) RRR measurements of weld samples from AES (Cooley) (b) RRR measurements of weld samples from ACCEL (Cooley) (c) SEM analysis of iris cut-outs from AES cavities (Cooley)
        Speaker: Cooley
      • 09:45
        Discussion: do we place order with AES for more one-cell cavities or order more material? 15m
    • 09:25 10:50
      3.9 GHz
      • 09:25
        Report on test results of 3.9 GHz Helium vessel weldment from Ameriflex 15m
        Speaker: Cooley, Hairong
      • 10:00
        Helium vessel status -- welder certification 10m
        Speaker: Foley
      • 10:10
        Helium vessel welding issues -- welder certification -- procedure 15m
        Speaker: Mitchell, Foley
      • 10:25
        Status of cavity No. 7 and Cavity No. 8 10m
        Speaker: Foley
      • 10:35
        Schedule for scanning 3.9 GHz blanks for single-cell cavities 15m
        Speaker: Cooley