Focus on:  Hide Contributions
  • Indico style
  • Indico style - inline minutes
  • Indico style - numbered
  • Indico style - numbered + minutes
  • Indico Weeks View
  • LCC style

Choose timezone

Your profile timezone:
Use timezone based on:
Login

3.9GHz Engineering meeting

10 September 2007
US/Central timezone
  • Overview
  • Timetable
  • Contribution List

Contribution List

8 / 8
0. Report on trip to observe AES equator welds
Foley
10/09/2007, 09:00
1.3 GHz
7. Comments on schedule/results for measurements and/or tests
Cooley
10/09/2007, 09:15
1.3 GHz
Comments on schedule/results for the following measurements and/or tests: (a) RRR measurements of weld samples from AES (Cooley) (b) RRR measurements of weld samples from ACCEL (Cooley) (c) SEM analysis of iris cut-outs from AES cavities (Cooley)
3. Report on test results of 3.9 GHz Helium vessel weldment from Ameriflex
Cooley, Hairong
10/09/2007, 09:25
3.9 GHz
8. Discussion: do we place order with AES for more one-cell cavities or order more material?
10/09/2007, 09:45
1.3 GHz
4. Helium vessel status -- welder certification
Foley
10/09/2007, 10:00
3.9 GHz
1. Helium vessel welding issues -- welder certification -- procedure
Mitchell, Foley
10/09/2007, 10:10
3.9 GHz
5. Status of cavity No. 7 and Cavity No. 8
Foley
10/09/2007, 10:25
3.9 GHz
9. Schedule for scanning 3.9 GHz blanks for single-cell cavities
Cooley
10/09/2007, 10:35
3.9 GHz

Back to the event

Indico
Powered by Indico v3.3.10-pre
  • Help
  • Contact