3.9GHz status

US/Central
The Hermitage

The Hermitage

    • 09:00 09:15
      Helium vessel re-work: has Simon verified that his welding operator can perform an inside weld pass to close the gaps? 15m
      Speaker: Foley, Johnz
    • 09:15 09:30
      Status of engineering note 15m
      Speaker: Peterson
    • 09:30 09:45
      Cryomodule interface document 15m
      Speaker: Pfund
    • 09:45 10:00
      Niobium shipment to W. Singer for machining Formteils 15m
      Speaker: Foley
    • 10:00 10:15
      Cavity No. 7 test schedule 15m
      Speaker: Rowe
    • 10:15 10:30
      Other business 15m