3.9GHz status

US/Central
The Hermitage

The Hermitage

    • 1
      Helium vessel re-work: has Simon verified that his welding operator can perform an inside weld pass to close the gaps?
      Speaker: Foley, Johnz
    • 2
      Status of engineering note
      Speaker: Peterson
    • 3
      Cryomodule interface document
      Speaker: Pfund
    • 4
      Niobium shipment to W. Singer for machining Formteils
      Speaker: Foley
    • 5
      Cavity No. 7 test schedule
      Speaker: Rowe
    • 6
      Other business