-
A. Yamamoto21/04/2008, 09:00
-
R. Geng, Y. Iwashita21/04/2008, 09:30-S0, process and test for Ichiro-5 Cavity -Optical inspection deviceGo to contribution page
-
E. Kako, F. Furuta, C. Ginsberg, L.Lilje21/04/2008, 11:00-Asia -Americas -Europe (XFEL)Go to contribution page
-
Hayano, Champion, Rimmer, Lilje, Padamsee , Iwashita21/04/2008, 13:30(incl. facility,capacity common use): KEK, FNAL, Jlab, DESY, Cornell, and, Kyoto ….Go to contribution page
-
L.Lilje21/04/2008, 16:00-35 MV/m with yield of 50 % for TDP-1 and -35 MV/m with yield of 90 % for TDP-2Go to contribution page
-
Akira Yamamoto (High Energy Accelerator Research Organization (KEK)), Carlo Pagani (INFN Milano LASA), S. Noguchi, T. Saeki22/04/2008, 09:00-Lorentz detuning, and discussions -Ball-screw-tuner test results (for LL cavity) -Blade-tuner (update) and/or any others status/proposal? -Reliability of the motor and the MaintenabilityGo to contribution page
-
Hitoshi Hayano (KEK)22/04/2008, 10:45
-
S. Prat, S. Noguhi, E. Kako, C. Adolphsen, Led by H. Hayano22/04/2008, 13:00-XFEL coupler: industrial assessment, and industrialization -Fixed/variable coupler : cost difference : technical issues -Requirements from RF power distribution system in view of MLI -Discussions on coupler specification and interfaceGo to contribution page
-
22/04/2008, 16:00Accelerator Physics and Technology Seminar *Note Location Change*Go to contribution page
-
S.Mishra,M. Champion, N. Ouchi, D. Mitchell, L.Lilje22/04/2008, 17:00-S1 plan at FNAL -S1-global plan - Work required at KEK and global assembly (technical feasibility) - Cooperation with FNAL / Cooperation with DESYGo to contribution page
-
N. Ohuchi, H, Carter23/04/2008, 09:00
-
D. Mitchell,H. Hayano,N. Ouchi23/04/2008, 09:30- Interfaces (CAD-work boundary condition) of plug-compatible design - Parameters tables for interfacesGo to contribution page
-
Led by Ohuchi and Carter23/04/2008, 11:00Conclusion/Consensus (Table filled) and Further study requiredGo to contribution page
-
T. Peterson, H. Nakai, K. Jensch23/04/2008, 13:30-Requirements and the regional constraints (How to handle Nb: summary of survey based on e-mail communication). -Comments and discussions for further worksGo to contribution page
-
P. Pierini, Led by Ohuchi and Peterson23/04/2008, 15:30-5 K shield study at TTF cryomodule design -5 K shield study at STF cryomodule design -Lowering radiation shield (80K) temperature -Discussions and conclusion/consensusGo to contribution page
-
H. Padamsee23/04/2008, 17:00
-
S. Fukuda24/04/2008, 09:00
-
J. Branlard24/04/2008, 09:15
-
Dr Stefan Simrock (DESY)24/04/2008, 09:35
-
S. Noguchi24/04/2008, 09:55
-
S. Michizono24/04/2008, 10:10
-
Mr Brian Chase (FNAL)24/04/2008, 10:25
-
24/04/2008, 10:35-Necessary cooperation with LLRF; status and requirements (TBD) -LLRF cooperation expected to STF and S1-global work at KEK -Discussions and strategy to reflect the work for TDP R&D activities,Go to contribution page
-
S. Choroba24/04/2008, 11:15
-
C. Nantista24/04/2008, 11:40
-
S. Fukuda24/04/2008, 12:00
-
E. Jongewaard24/04/2008, 13:30
-
C. Burkhart24/04/2008, 14:00
-
24/04/2008, 14:30
-
Chris Adolphsen (SLAC)24/04/2008, 15:30
-
Chris Adolphsen (SLAC)24/04/2008, 15:55
-
V. Kashikhin24/04/2008, 16:00
-
M. Wendt24/04/2008, 16:30
-
P. LeBrun24/04/2008, 16:50
-
24/04/2008, 17:20
-
A. Yamamoto25/04/2008, 09:00
-
L. Lilje, H. Hayano25/04/2008, 09:30
-
N. Ouchi/T. Peterson, S. Fukuda, C. Adolphsen25/04/2008, 10:45
-
Led By Yamamoto, H. Padamsee25/04/2008, 13:30-Functional Parameters -General guide-line for plug-compatibility -Common interface parameters (consensus) -Works for further consensus General Comments Closing RemarkGo to contribution page
-
25/04/2008, 16:00
-
Akira Yamamoto (High Energy Accelerator Research Organization (KEK))
Choose timezone
Your profile timezone: