Accelerator Physics (LET)
→
GMT
,
Description
14:00 GMT
Survey/Alignment Model
Report by Freddy Poirier
Coupler RF kick
Report by Andrea Latina and Kirti Ranjan
REport by Kiyoshi Kubo
- - - - - - - - - - - - - - - - - - - - - -
WebEx:
Topic: LET Simulation (Accelerator Physics)
Date: Tuesday, June 17, 2008
Time: 2:00 pm, Greenwich Standard Time (GMT -00:00, Casablanca )
Meeting Number: 599 929 567
Meeting Password: ilclet
Please click the link below to see more information, or to join the meeting.
-------------------------------------------------------
To join the online meeting
-------------------------------------------------------
1. Go to https://fnal.webex.com/fnal/j.php?ED=106124632&UID=0
2. Enter your name and email address.
3. Enter the meeting password: ilclet
4. Click "Join".
-------------------------------------------------------
To join the teleconference only
-------------------------------------------------------
Provide your phone number when you join the meeting to receive a call back. Or, call the number below and enter the meeting number.
Call-in toll-free number (US/Canada): 866-469-3239
Call-in toll number (US/Canada): 1-650-429-3300
Global call-in numbers: https://fnal.webex.com/fnal/globalcallin.php?serviceType=MC&ED=106124632&tollFree=1
Toll-free dialing restrictions: http://www.webex.com/pdf/tollfree_restrictions.pdf
Freddy Pitier reported results of Main Linac simulation with the Survey/Alignment model.
From this work and Kiyoshi Kubo's report in previous meeting:
• Basically, the results are consistent.
• LICAS’s set of parameters gives very small emittance growth
• Rough tolerances of each error parameter is estimated.
We can claim that we have made a “standard” survey/alignment model. "LICAS" Group (for "new" survey technique) gave a set of parameters. But it has not been established as "standard" set. We need help from “conventional” survey/alignment experts. But it may be difficult now, may be next year.
Andrea Latina and Kiyoshi Kubo reported simulations including Coupler RF kicks.
There is no significant effect in Main Linac for the "old" coupler configuration.
Some emittance growth (1 or 4 nm) in Bunch Compressors.
Need to look at the "new" configuration.
There are minutes attached to this event.
Show them.
The agenda of this meeting is empty