September 10 15:30 - 17:30, ATF LC meeting room, KEK
Participants : Terunuma, Araki, Kubo, Kuroda, Yamanaka, Oroku(WebEx), Kamiya(WebEx)
*** Progress of Shintake monitor (ATF2 IP-BSM) work ***
Slides by Takashi Yamanaka (Univ. of Tokyo)
* Removal of the optical components has finished and
we are ready to move the optica tables.
* Items of crane operation
- move the pulsed laser to the outside of the tunnel
- move the laser chiller to outside of the tunnel
- move the laser mounted table to the outside of the tunnel and
replacement of the adaptors between the surface table and the tresle
- align the vertical optical table to the beam line
shims for level alignement will be inserted between the horizontal bench
and the floor.
Slides by Masahiro Oroku (Univ. of Tokyo)
About PMT gain curve measurement
* There is no significant change between this time and a half year before.
*PMTs work properly in the low voltage area.
Now we are preparing to examine the linearity of PMTs by changing the light amount.
About Detector Allighment
*At the same time with Bend and Final focusing magnet
Suggestion
There is no need to do the detector allighment at the same time.