MDI/Integration meeting
Friday 9 Jan 2009, 17:30
→
19:50
Asia/Tokyo
1
mechanical structure of SIT, TD, SET and EDT
Remained issues and questions -alignment -support of the inner detectors -some cooling system is needed even for 22W in all of SET -power switching performance , i.e. 1/70 reduction, safety factor to be added?
Speaker
:
Dr
Aurore Savoy-Navarro
(
LPNHE-UPMC/CNRS-IN2P3
)
Slides
2
Draft of LOI MDI sections
Detector solenoid (with DID) ~ 3 pages IR and machine bkg ~5 pages Assembly and integration ~ 6 pages
Speaker
:
Dr
Karsten Buesser
(
DESY
)
document
a) ILD note: Be Beam Pipe
Speaker
:
Dr
Yusuke Suetsugu
(
KEK
)
document
3
Dynamic analysis of the square support tube etc.
Speaker
:
Hiroshi Yamaoka
(
KEK
)
Slides
4
Integration meeting at CERN in January